开云全站-联系方式

    全国服务热线:13632801995
  • 联系人: 赵先生
    传    真:0755-28486188
    网    址:www.
    公司地址:深圳市龙岗区坪地街道深圳市龙岗区坪地街道富士龙工业园一栋
您所在的位置:首页›› 开云全站新闻›› 行业新闻›› 开云全站-宏旭定制 混凝土消防蓄水池模具 消防蓄水池模具【价格,厂家,求购,使用说明】

开云全站-宏旭定制 混凝土消防蓄水池模具 消防蓄水池模具【价格,厂家,求购,使用说明】

      宏旭定制 混凝土消防蓄水池模具 消防蓄水池模具 宏旭定制 混凝土消防蓄水池模具 消防蓄水池模具

宏旭定制   混凝土消防蓄水池模具    消防蓄水池模具

Compared with the traditional brick inspection well, the inspection well adopts high-density engineering plastic barrel, which has good sealing performance, no leakage, light weight, easy transportation, high compressive strength, acid and alkali resistance, long service life, and no professional installation. For tanks with different drum effective volumes, the tanks are horizontal and vertical, and each has a plurality of reinforcing ribs. The structure can improve the strength and the pressure of water in the tank body. The upper part of the tank body is provided with a sewage pipe connection.

The market scale of fire water reservoir mold concrete fire water reservoir mold is increasing month by month, because the demand for this kind of reservoir prefabricated parts is increasing, and the benefit of reservoir mold is gradually decreasing. Because of the bad market competitio����ȫվ.txtn, many small manufacturers want to share a share, but the quality and production requirements can not meet the production needs. The scale and benefit of the pool mold market is based on the production requirements. The main application is 4 thick panels and 5 thick rib plates. The material selection is strictly in accordance with the standard original steel plate. In the inspection well mold construction, we should pay attention to whether it needs to be cast on site or prefabricated. Therefore, according to different production points, the mold production content is different. The key point of mold material selection of fire water reservoir mold is to ensure the quality of the mold. Therefore, before blanking, the reinforcement plate and panel should be divided and blanking according to the size of the mold. In the process of mold construction of concrete fire water storage tank, attention should be paid to the overall separation of internal and external formwork. During the production of precast reservoir, the connection hole should be placed between the internal and external formwork, and the position of the hole should be adjusted according to the position of the pipeline. In the process of cast-in-place production, attention should be paid to the tightness of upper and lower formwork butt joint.



上一篇:开云全站-PP塑料 10L,15KG,18升30公斤密封桶模具 5升10公斤18L20KG密封桶模具 开模【价格,厂家,求购,使用说明】 下一篇:开云全站-浙江混凝土路沿石模具加工价格【价格,厂家,求购,使用说明】