宏旭—预制矩形排水沟钢模具—矩形水沟钢模具
The prefabricated rectangular drainage ditch steel mold will be processed according to the standard way during the production, so as to ensure that the drainage ditch structure is complete, and meet the processing requirements, and can smoothly produce a large number of prefabricated parts for the project. During production First, the mold needs to be simply spliced, and then wipe the mold with a rag. No dust can be accumulated on the surface of the mold. Then, the release agent is evenly applied to the mold to make the inner cavity of the mold very smo����ȫվ.txtoth. In this way, after pouring the slurry, the slurry adhesion will not occur when the mold is removed, which also ensures the quality of the prefabricated parts. Cement and concrete are two kinds of building materials. After mixing evenly, the slurry is poured into the steel mold of prefabricated rectangular drainage ditch. The insertion of vibrator will make the mud vibrate, and some bubbles will slowly float out of the surface of the slurry. This step is to make the slurry evenly fill every corner of the mold, and ensure that the mold is in the air The location of the wind, or place a few more typhoons around to speed up the air drying of the mud. The prefabricated rectangular drainage ditch steel mold is very fast when the formwork is removed. Loosen the bolts and take out the prefabricated parts.